Kaprin

How we deploy

Scope in 24 hours. Embed on day one. In production by about day 45.

A Kaprin engagement runs on four stages. Here is what happens in each, what you will see, and what we need from you.

Forward deployed engineering means senior engineers working inside your team, in your cloud, until it runs in production.

See the first 90 days
  1. 1

    Within 24 hours

    Scope

    You describe the problem in a short form or a call. A senior architect reviews it and replies with a scoped architecture, a fixed timeline and the single baseline metric we will move.

    What you see

    • A written scope and architecture sketch
    • A fixed timeline and pod composition
    • The one number we will measure against

    What we need from you

    • A short description of the bottleneck
    • A named decision maker
    • An NDA if you want one before details
  2. 2

    Day 1

    Embed

    Our engineers join your chat, your repository and your standups. They sit in on the real work, get access to real data and ship a first thin slice early.

    What you see

    • Named engineers in your channels
    • A written week-one plan
    • A first slice running on real data

    What we need from you

    • Repository and environment access
    • Sample data or a sandbox
    • An hour a week from the people who do the work
  3. 3

    Weeks 2 to 6

    Harden

    We make the system safe to depend on: tenant isolation, concurrency control, schema-validated model output, an evaluation suite, monitoring and spend caps. A live demo every week.

    What you see

    • Weekly working demos
    • Test and evaluation results
    • Monitoring and spend dashboards

    What we need from you

    • Feedback on every demo
    • Edge cases from real operations
    • Approval for the production cutover
  4. 4

    By about day 45

    Hand off

    Code, database, infrastructure scripts and documentation sit in your accounts. Your engineers ship changes alongside ours so ownership transfers for real.

    What you see

    • Runbooks and architecture notes
    • A recorded walkthrough
    • Your team shipping a change

    What we need from you

    • Engineers to pair with
    • A decision on a support retainer, if you want one

Handoff is designed in from day one

Forrester describes forward deployed engineers as training wheels: temporary by design. We agree. Your team should be able to run what we build without us.

  • Source code and database in your repository and cloud account
  • Runbooks, architecture notes and decision records
  • Evaluation and regression test suite
  • Monitoring, alerts and spend caps you control
  • Paired sessions with your engineers
  • Credential and access ownership in your accounts
How an FDE engagement is supposed to end

Frequently asked questions

What happens in the first 24 hours?

You send a short description of the problem. A senior architect reads it and replies with a scoped plan, a timeline and a baseline metric. There is no sales sequence before that.

Do we need to prepare anything before day one?

Access to the repository and environment, sample data, and a named person who can make decisions. We send a checklist when scoping is agreed.

How many engineers will we get?

Usually two: a principal architect and a senior systems engineer. Larger scopes add a third. They are named in the engagement.

What if the scope changes mid-sprint?

Sprints are fixed scope. If priorities change, we agree the trade-off openly at the weekly demo and adjust the plan in writing.

Can you keep supporting us afterwards?

Yes, on a light handoff retainer. It covers support and the next workflow. Your team can also run everything without us.

Bring us the broken prototype, the SaaS bill, or the manual process

Tell us what is stuck. We reply within 24 hours with a scoped plan, a fixed timeline and the one number we will move.

FDE = forward deployed engineering. Strict NDA protection. Senior architect review.